Saturday, September 14, 2013

Sandinsanity & Acetone

So that whole going to work thing kinda got in the way of my boat building project. I apologize for that. Anywho, the project I was working on at CCG is set back so it doesn't like I'll have to go back into work for awhile (if ever). I'm not heartbroken over that. The extra money would have been nice but I can get along without it.

So today I hit the sander hard to clean up the very very sloppy job I did last week on the keel. I can't believe the drips & runs I left. What a mess. The sander made pretty short work of it though. Once that was cleaned up around the bow I wiped the sides down with acetone. Yes I wore a respirator and had all the fans going. I've have to protect the few remaining functional brain cells I have left ya know. :-)  I've kinda been dreading doing the 10 oz fiberglass, based on my experience on the transom, but I gotta get it done while the weather is cooperating if I'm going to have any chance of flipping this whale over in the spring.

Didn't take any pictures today so here's a random one from the photo album.


I don't know if I posted this one before. Never mind the 'what's this?'. I know what it is now! That's the 'fugly' Yanmar stock engine control panel. I've got it stripped down and am going to make my own control panel this winter. I bought a complete set of 'Faria Chesapeake' guages.

Been looking at other TW28 control panels and there's a few I like and might follow the same path.

This is almost without a doubt the finest I've seen on a TW28. It was done by a gentleman in Belgium. There's a few design changes I'll make. I intend to incorporate a 12" Chartplotter in the dash panel and move all the switches to an overhead console. My engine controller will be tucked up farther forward because we're adding sliding doors to the sides of the main cabin. I think my wheel is a bit bigger than this one so that's an issue I'll have to deal with. Probably a good idea to build a mock-up this winter to see how it'll all come together.

Tomorrow's task to hang the glass on the sides and get ready for some more epoxy work. Weather is looking pretty good to get it done this week. Standby...


Sunday, September 8, 2013

My ole' Grandpa

was a wise ole' fella. Always used to tell me: "Never trust a guy with a clean workshop, he's not busy 'nuff to be any good!" Yeah well that may well be true Grandpa but I just had to clean up my boat shed today. I made a heck of a mess building the sewing table & shelves so out comes R2D2 (Shop Vac) to clean up the sawdust. Working my way along the workbench I also found a few tools I had though long lost. :-)

So I sit there, taking a wee break and looking at my handiwork. Well sorta handiwork and ponder the enormity of the task I still have ahead of me. For one tired old fart, retired simple servant building this boat is a monumental effort. I hit it hard this summer, as much as the weather would allow and got quite a bit done but there's still a lot to do before I can flip this pig over. A thought pops into my head, something I remember from high school English class I think.

So I wrote that on the shed door. It seems a really negative thought but it will constantly remind me to to keep my eye on the prize. Knowing that after it's all said and done we'll have a boat something like this.

It'll be our escape vehicle. It'll have the range, endurance and amenities to take us where ever we want to go (hopefully someplace warm in the winter). It may not be the biggest or fanciest on the water but it will be ours and I will be able to proudly say to anyone that asks "I built it myself!"

Occasionally I look back through all the pictures of this project and for the life of me I can't remember doing half that stuff. It's kinda weird. I know I did that but I don't have any memories of doing it. I think it has to do with the scale & scope of this project and how much you're always thinking ahead of what needs to be done next, what needs to be done our bought for next week or next month or even next year. I see it all coming together in my head but there's no timeline associated with it. People ask me all the time: "When will it be done?" My standard answer is '2 years' but if it takes longer that's Ok. I want to take my time and make it nice. I really don't want to spend all this time, effort & money and have it coming out looking like a POS.

Ok that's 'nuff. I gotta go gather up clothes suitable to wear to work tomorrow. Thanks for looking in and standby....



Saturday, September 7, 2013

So I'm having a little conversation

with Lori via Facebook chat. I happen to mention that she might have some extra shelf space left over. There's a silence. No response. Two minutes pass and I send her another message: "Did you fall off the chair darlin'?" Ok, still no response. I get the distinct feeling she's browsing the 'Joanne's Fabrics' web site for sales. Hmmmm? "You know, just 'cause you have more shelf space there's no need to run out and fill them up. Ya know?" "Dear?" Her response came about 5 mins later and was something like this: *giggle*

Anywho, this morning I finished the installation of the shelves. Sorta turned out the way I had envisioned them.

First step was mounting the shelf brackets I assembled and painted yesterday. Got them all nice & level & plumb with my handy dandy laser level. Sweet little tool.

I know it looks kinda weird. Sorta like half pine tree's with no needles! ;-) These got firmly screwed to the studs behind the drywall. There's no way they're coming off the wall!

Next the shelves went on. Pretty simple stuff. Only took a half hour or so. I remembered to turn the ceiling fan off this time! ;-)

I kinda like how they turned out. Pretty simple. Not fancy woodwork and all construction grade plywood and whatever paint I had left.

So I proceeded to unload everything I had stacked up on her sewing table to the shelves. It didn't take long to figure out there wasn't going to be a whole lot of shelf space left and she's still got tubs & tubs of stuff squirreled away to sort through.

Before:

After:
The cleared off Sewing table.


That's it for this project till the boss gets home and sorts it out. There's still some rearranging to be done in the corner opposite the sewing table. She has a 4 drawer dresser to go in there and I've got to figure out something for all her patterns. A trip to Joanne's or Michael's for storage boxes might be in order! *sigh*

I'd say this project too me roughly 6 days and about $250 in materials.


Thursday, September 5, 2013

Sewing Room Rehab Part Deux

So with the fiberglass put on the keel yesterday, today's task was to start the shelves for Part 2 of the sewing room rehab. I had the lumber store cut the plywood (cheaper construction grade) I ordered to width so all I had to do was round some corners and cut the lengths I wanted before sanding the edges in prep for paint.

There'll be 5 shelves on two walls joining in the corner. The left hand side will be 16" deep shelves and the right side 12" deep shelves. Style is similar to the ones I did above the sewing table but not as fancy.

Before:
Sorta after:

I apologize for the crappy cell phone pics. Forgot to bring my GoPro camera. Hadn't seen that corner of the room in awhile!  ;-)  Found a few petrified surprises left by one of the cats!  ;-(

This afternoon I assembled the shelf brackets. They'll get a sanding before I paint them tomorrow.

Managed to get a coat of battleship grey paint on the underside of the shelves before I called it quits for the day. Tomorrow they'll get a nice color similar to the shelves above the sewing table. Standby....





Wednesday, September 4, 2013

I new it would.........

I knew it would take me 2 1/2 hours and it did, exactly. Approx. 1 1/2 gallons of epoxy, 12 yds of 12 oz fabric, two roller sleeves and the very last layer (Yeah!) of structural fiberglass is on the keel.

It's been awhile since I crawled up on top (well actually the bottom) of the boat and did any fiberglass work. I've got a few sore muscles to show for my labor. You can see the blue patch where I was testing filler recipes. I forgot it was there and almost slipped off the boat! Not a big fall, six feet or so, but it probably would have put an end to my goo session for the day. It wasn't the prettiest or the neatest epoxy job I've done and there's quite a few drips that'll need to be sanded down before I lay out the 10 oz satin weave fabric for the sides. That'll come tomorrow if I don't have to go into Ottawa.

Thanks for looking in and standby.....