Saturday, October 20, 2012

Got tired of tripping over sh*t

so added a little organization to the boat shed.

Just happened to be on sale yesterday at Crappy Tire so I snapped it up. I added the shut off valve and the pressure regulator that I had left over from other projects.

My Jeep has developed a case of "Death Wobble" so it's going in the shop on Tues to see what's going on. Hopefully it's not an expensive fix. The Camaro goes away for the winter likely Monday night. *sigh* And......... My neighbor is tuning up his snow blower! :-(


Saturday, October 13, 2012

It's that time of year

to start buttoning up everything for the onslaught of winter that'll arrive soon! *sigh*

I had a visit from a fellow boat builder, Peter Lenihan. I don't know if you remember Peter but he built a Bolger Windemere (Turtle Bay) and launched it last year. He came up from Montreal for the day to hang out in the Big Blue Boat Building Building I Built! :-)

Peter fully in command of his vessel!

Peter built his boat in a bow shed similar to mine. He has missed his shed and enjoyed mine, maybe a lil' too much! :-) He looked over the boat project so far and was impressed with the amount of work. He'll be back in the spring to help me with the epoxy & fiberglass work. What a great guy, he even bought me lunch when I forgot my wallet!

Back to buttoning up. Well more like cleaning up and organizing stuff. One of the jobs I had to do was clean out the epoxy metering pump thingy. I'm changing epoxy systems and wanted to make sure there wasn't any of the old stuff left that might contaminate the new epoxy.

This is a great gizmo. All you have to do is ensure you keep the reservoirs full and the pump will accurately meter and mix the epoxy ready to go. No muss and very little fuss. The downside is the reservoirs are small, 4 qts and 2 qts. The ratio is two parts resin to one part hardener. Just means you have to refill them often. The hardener container is opaque so you have to be careful and make sure it's got stuff in it. We learned that lesson the hard way.

All reassembled and ready to go next spring.

Well that's about it. I have to cover the cabin roof with a new tarp and get my buddy Andrew over to patch a few small holes in the shed roof and we should be good for the winter. I know it's not very exciting but it's all I got.

Stay Frosty My Friends.   :-)


Thursday, September 27, 2012

I'm not happy

with the results of the other day's epoxy session. I'm going to put boat building on hold for awhile. Hopefully by the spring my knee will be better and my mobility not as restricted. I'll also go looking for a helper who doesn't want $50/hr, retirement and medical benefits and a company car.

I'm making a lot of amateurish mistakes and that really bugs me because I know better but get in a rush to get through a job and end up wasting about $300-400 in materials.

So aside from a little sanding and filling that's all that's going to get done to the boat this year. Don't be disappointed. I'm not. I knew this was a big project and underestimated the amount of physical effort involved. Time to just step back a little and reassess the situation. It's not a race and we'll be back in the spring. Thanks for looking in.

Standby....

Tuesday, September 25, 2012

These friggin' guys

on the Internet make it look easy! Like hell! Six hours on top of the boat today and I only got one half of the keel epoxied. Up and down, up and down! I feel like I've been rode hard and put away wet! ;-)

I had a hard time getting the heavy fabric to lay over the curves and ended up with some bridging. I'll sand those out and fill them. I don't suspect it'll affect the structure at all. I just don't want any voids in the laminates. My second gaff was having to change epoxy brands mid way! I thought I'd have enough of the old stuff in the metering pump to get the job done! NOT! This monster sucks up epoxy like a drunken sailor with a keg 'o swish! I figure I used three full gallons on just the bottom and one side of the keel. That equated into about two dozen trips up and down the ladder to mix epoxy. *sigh* At least my bum knee is getting a good workout.

I don't think I'll tackle the rest tomorrow. Taking some friends out for brunch so that'll screw most of the day and I intend to goof off the rest of the day. It'll mean a couple hour sanding session before I can get the rest of the layers on. Oh well. That's the best I can do working alone.

Had a Close Encounter of the Third Kind the other day! :-)


Stay tuned!

Monday, September 24, 2012

A little whine with my cheese please

Bit of a frustrating day. The designer specifies two layers of fabric for the keel. The first layer has the fibers oriented in a 45/45 degree pattern. The most common biaxial fabric. The second layer has the fibers oriented in a 0/90 degree pattern. When laid over top of each other you have fibers oriented in 8 directions for maximum strength through the entire laminate.

Here you can see the end of the roll of fabric. The fibers are oriented at 45 deg angles to the long axis of the cloth.

Now the problem comes from the fact I specifically ordered 0/90 for this particular roll and was sent 45/45. *sigh* I didn't check the package when it arrived, about 6 months ago and was bought specifically for the keel. *double sigh* My own dumbass mistake.

In order to get past this lil' screw up I had to lay the second layer of cloth over the first at 45 deg angles. Not really a big deal just a lot more work. I didn't grab any pics 'cause I was a lil' cheesed off hence my whine. I'll get some pics tomorrow if I decide to go up on the boat and start epoxying all this together.

So ends the whine! Now for some brie please!