Tuesday, April 17, 2018

Winter just won't let go!

Holy frig! Who's doing the 'Snow Dance' out there? Please stop!!! It's mid-April and we've got 6 inches of snow with half inch of ice on top of it! Enough already! *sigh* </rant>

Ok, got that out of my system.

With all the snow & rain the boat shed is flooded. It's a quagmire in there. I'll need 3-4 days of good weather to dry it all out. My buddy Andrew was by last week to help patch a blowout on the shed.

Andrew "Monkey Man' Miller patching yet another blow out on the shed.
Good thing for Andrew. He's been with me on this adventure since the start. I wish I could have him on the project all the time.

Sad day last week. We had to say Goodbye to our Project Director. Poor ole' Squirt had been suffering from the ill affects of kidney failure and other issues. We tried hard to keep him going but in the end we failed. Sorry Squirt. :-(

Squirt AKA The Project Director 2004-2018

I've got all the supplies I need to hit the road running on the boat this spring, weather permitting. Epoxy? Check! Fiberglass? Check! Wood Flour? Check! and the list goes on. First task however will be to get the engine off my trailer and into the shed. I should have the I-Beam braced & ready to lift the engine by Saturday. We'll see how mucky it is and if we can move the engine.

That's about it for now.

Standby....

Friday, November 10, 2017

Goals for Next Year

So after a very disappointing year in the boat shed I've got to try to get this project on some sort of track. I'm thinking I'll set some goals to be met.


  1. Finish Rudder: Final fairing & infusing reinforcement (glass and carbon fiber) layer. Paint.
  2. Install Engine: New motor mounts, fasten down into place. R&R all hoses & starting circuit wires.
  3. Install Skeg: Seal and bolt in.
  4. Install Rudder: Finish rudder stuffing box mount & down tube. Install bronze rudder bushing.
  5. Install Prop Shaft: Install shaft tube and bearing carrier. Install shaft and have custom cut to length. Reinstall.
  6. Frame E Install: Main bulkhead install.
  7. Finish Tabbing: Almost all internal joints need another layer of tape and/or fillets & tape.
  8. Tank, Water Heater & Battery Beds: Fabricate and install all six tank beds and one each for batteries and hot water heater/pumps.
  9. Aft Framing: Complete last three aft frames.
  10. Raw Water Inlet: Install raw water inlet for engine cooling.
  11. Exhaust: Run exhaust hose and thru-hull so that engine can be run every few months.
  12. Crash/Bilge Pumps: Install crash & bilge pumps in engine space
I think I can do that much this upcoming boat building season. It's a lot of work and I know I'll need some help for some of it. We'll see how well the old body holds up. Hoping to get a good head start on it in the spring, weather permitting of course. 


Standby......

Monday, October 23, 2017

At Long Last

At long last our lil' huffer (diesel engine) has made it's way home.
Yanmar 4JH-TE 55 Hp Turbo
It took approx 6 months to get the fuel injection pump rebuilt and re-installed. Apparently it was a problem with sourcing the parts required. There was a lot of damage inside the pump from improper storage (my fault) or pre-existed. Anyhow it's home.

The Offender - Fuel injection pump
She's all tucked away under 4 layers of tarp and sitting in the lil' red wagon. I've got some work to do in the shed in the spring and we'll set her in the boat ASAP. The service technician said I should run it ever 3-4 months so that's what we'll do!

That should be it for boat building this year. I know there wasn't much that got done and nobody is more disappointed in that than me. Maybe next year will be better.

Stay well and happy my friends. See you in the spring.

Yours Aye!

Rick & Lori

Monday, August 28, 2017

This and That

With only a couple weeks left before we head out on our Big RV Adventure I've been doing just a little of This & That around the boat.

A few days spent fairing the frakkin' rudder! *sigh*
Multiple coats of Quickfair
A couple more coats of Quickfair and I should be ready to add the reinforcements.

Yes Dear! I did read the instructions! *Grrrrrrrr*
Stations Drawing
Double checking measurements for the placement of the bulkheads. I got bulkhead (station G) lined up today and will glue/tape it in tomorrow.
Bulkhead G aligned ready for glue & tape. Bulkhead I in the background.
Working on dirt it's a PITA to have to re-level the boat every time it rains. We've been in drought for almost a week now so the boat has settled quite nicely. I use a 'water level' for that.
Right On The Bubble
Measuring the level on the top of the bulkhead, Nailed It! :-) Lil' bit fussy when it comes to that sorta stuff. It's plumb too!

That's about it. Standby....

Thursday, August 17, 2017

Just Puttering Around

The weather's too nice, it hasn't rained in 36 hrs so I got to work on some minor tasks.
Frames H and I
The two after most frames needed glass on one side. I did the other side last year.
Turned out pretty nice
Pulled some offcuts out of the bin and trimmed them to size. It was warm out so I knew I had to work quickly. The smaller bulkhead took about 20 oz of epoxy and the larger one almost 30 oz. That's some heavy glass. Probably the 24 oz triaxial I had laying around. I had it so I used it. Wasn't totally necessary to glass these two but they will certainly be waterproof!

The other thing we did today was pick the plastic wrap off the backside of the rudder. OMG! What a PITA! For you old folks out there OMG = Oh My God! and PITA = Pain In The Ass! :-)  Never, ever pour foam over plastic!!!
Picking Plastic off the Foam
The Admiral loaned an extra pair of hands and we had it done in half an hour or so. I got the first layer of mud on and that'll be ready to sand later on today.

I did manage to get the boat levelled. Let's hope it stops raining or I'll have to do it again. Don't, ever, build a boat on dirt! :-(

That's it. Thanks for looking in.

Cheers!