Tuesday, May 14, 2013

Doesn't look like much

but it was 4 hrs of sanding and wiping to prep the surface for fiberglass.

I'll likely get to the epoxy work on Thursday or Friday. Hopefully it'll be a bit warmer. I'm not over enthusiastic about the results of the previous fiberglass/epoxy job. I think it might have been too cool in the shed.